Toyota — Torque Converter

3 - 25 Disassembly Procedure 1 Remove the switches (neutral switch and backup lamp switch). [Point 11 2 Remove the inching lever. 3 Remove the shift lever. [Point 21 4 Remove the shift cam lever. 5 Remove the control valve (control Wtregulator cover ASSY). 6 Remove the steel ball. [Point 31 7 Remove the spring and steel ball. [Point 4) 8 Remove the inching cam lever. 9 Remove the valve body plate cover. 1 0 Remove the valve body plate and gasket. 11 Remove the selector valve. [Point 51 1 2 Remove the oil seal. [Point 61 13 Remove the valve holder plate. (Pay attention t o spring jumping out.) 1 4 Remove the inching valve. [Point 71 15 Remove the valve holder plate.

(Pay attention t o spring jumping out.) 1 6 Remove the regulator valve, inching rod, orifice valve and modulator valve. [Point 71 17 Remove the change valve. [Point 81 Reassembly Procedure The reassembly procedure is the reverse of the disassembly procedure. Note: When installing the inching cam lever and shift cam lever, apply a thin coat MP grease on the inside of the upper cover and oil seal. Coat torque converter oil on each valve before reassembly.