1 Drain torque converter oil. 2 Remove the transmission cover & control valve ASSY. 3 Remove the torque converter ASSY. [Point 11 4 Remove the oil pump Wlstator shaft. [Point 21 5 Remove the front cover. [Point 31 6 Remove the side cover (in 2 - speeds torque converter only). 7 Remove idle gear No.2 (in 2 - speeds torque converter only). [Point 41 8 Remove idle gear No.2 bearing (in 2 - speeds torque converter only). [Point 51 9 Remove clutch shaft No.2 W/clutch drum No.2 (forward). [Point 61 10 Remove idle gear No. 1 and idle shaft. [Point 71 1 1 Re,move idle gear No. 1 bearing. [Point 81 12 Remove clutch shaft No. 1 Wlclutch drum No. 1 (reverse). [Point 91 13 Remove the oil strainer.
14 Remove output shaft No. 1 and output gear No.2. [Point 101 1 5 Remove output shaft bearing No. 1. [Point 1 1 I 16 Remove bearing No. 1 (for clutch shaft No. 1 ). [Point 121 17 Remove bearing No.2 (for clutch shaft No.2). [Point 131 18 Remove output shaft bearing No.2. [Point 141 19 Remove the oil filter. (Use the SST 09228 - 07500.) Reassembly Procedure The reassembly procedure is the reverse of the disassembly procedure. Note: The tightening torque for each part is as follows: Unit:
N.m (kg - cm) [fl-lb] Oil strainer set bolt - 9.81 15.69 (100-1 60) 17.24- 11.581 Oil pan set bolt 5.88-7 .85 (60-8 0) 14.34- 5.791 ldle shaft 4.90-9.81 (50-100)[ 3.62-7.241 ldle shaft set bolt 3.92-6 .86 (40-7 0) [2.89-5 .061 Front cover set bolt 18.63-30.40( 190-310)[ 3.75-22.431 I Side cover set bolt 3.92-6 .86( 40-7 0) f2.89-5 .061 Transmission cover (upper cover) set bolt - 9.81 15.69 (100-1 60) [7.24-1 1.581 Stator shaft set bolt 9.81- 15.69 (100-160)[ 7.24-11.581