Disassembly Procedure 1 Measure the ring gear backlash and (Runout measurement applies only t o the 1 ton series) [Point 1 I runout. 2 Remove the thrust screw. (Only in 1 ton series) [Point 21 3 Remove the bearing cap and adjusting nut. [Point 31 4 Remove the differential case ASSY. 5 Remove the side bearing. [Point 41 6 Remove the differential upper case. [Point 51 7 Remove the side gear, pinion gear, spider and thrust washer. [Point 61 8 Remove the ring gear. 9 Remove the differential carrier cover. [Point 71 10 Remove the drive pinion bearing retainer set bolts, and remove the retainer & out - put gear and the reduction gear Wtbearing. [Point 81 Wtdrive pinion 11 Remove the output gear.
[Point 91 12 Remove the drive pinion. [Point 101 1 3 Remove the reduction gear. [Point 111 1 4 Remove the oil seal. [Point 121 Reassembly Procedure The reassembly procedure is the reverse of the disassembly procedure Note: Coat thread tightener (08833-00070) on the ring gear set bolt before tightening it. Coat thread tightener (08833-00080) on the drive pinion bearing retainer set bolt before tightening it. Coat sealing agent (08826-00090) on the mating surfaces between the differential carrier cover and differential carrier. The tightening torque for each portion is as follows: Unit:
N - m (kg - cm) [ft-lbl Output gear lock nut - - - 343.23 392.27 (3500 4000) 1253.23 289.401 Drive pinion bearing retainer set bolt - - - 88.26 11 7.68 (900 1200) [65.12 86.821 Differential carrier cover set bolt - - - 29.42 44.13 (300 450) [21 .71 32.561 Ring gear set bolt - - - 127.49 176.52 (13 00 1800) I94.06 130.231 Differential upper case set bolt - - 1.2 ton series: 43.15 53.94 (440 550) l31.83- 39.791 - - 3 ton series: 86.30 102.97 (880 1050) i63.67- 75.971 Differential case bearing cap set bolt - - 117.68 137.29 (1200 1400) [86.82-101.291 Thrust screw lock nut (1 ton series only) - - 102.97 127.49 (1050 1300) [75.97- 94.061