Point Operations [Point 1 I Disassembly: Measure the ring gear backlash and runout before starting disassembly. 1. Measure the ring gear backlash. Backlash: 1.2 ton series: 0.2 - 0.3 m m (0.008 - 0.012 in) 3 ton series: 0.3 - 0.4 m m (0.012 - 0.016 in) 2. Measure the ring gear runout (1 ton series only). Ring gear runout limit: 0.1 m m (0.004 in) [Point 21 / Inspection: Measure the thrust screw cap length. Standard length: 13.0 m m (0.512 in) Limit length: 12.2 m m (0.480 in) Reassembly: Coat liquid packing (08826 - 00080) on the threaded portion of the thrust screw before reassembly. Reassembly: Adjust the clearance between the thrust screw cap and rear face of the ring gear).
(Fully tighten the thrust screw, and return it by 116 turn.) Clearance: 0.2 - 0.3 m m (0.008 - 0.012 in) [Point 31 Disassembly: Punch a match mark on the bearing cap and carrier. Reassembly: Align the match marks on the bearing cap and carrier at the time of reassembly. Reassembly: When tightening the bearing cap set bolt, temporarily tighten to the following torque first. After adjusting the side bearing start - ing force and ring gear backlash, tighten to the final tightening torque shown below. Temporary tightening: 114.47 ft-lbl Final tightening: T = 19.61 N-m (200 kg-cm) T = 117.68 - 137.29 N - m (1200 - 1400 [86.82 - 101.29 kg-cm) ft-lbl