Toyota — Engine

Removal Procedure 1 Remove the radiator cover 2 Remove the engine hood. 3 Remove the toe board. 4 Remove the battery and battery case. 5 Disconnect the electrical parts wiring, and remove the bracket Wlelectrical parts. (Keep the fuse box free by removing the set bolts.) 6 Remove the radiator reservoir tank. 7 Remove the air cleaner. [Point 11 8 Remove the undercover and tire cover RH. (Only 22 engine models) 9 Drain the coolant. 10 Remove the fan shroud and radiator. 11 Disconnect the exhaust pipe. 12 Disconnect the fuel hose. [Point 21 13 Disconnect the accelerator wire (on the carburetor side in gasoline engine models, or on the injec - tion pump side in diesel engine models).

14 Remove the frame side covers RH (rear and front). 15 Remove the oil pump Wlpump hose. 16 Remove the horn. 17 Disconnect the shift lever link rod. 18 Disconnect the inching wire. 19 Disconnect the torque converter cooler hose. 20 Disconnect electrical wiring. 21 Remove the propeller shaft cover and propeller shaft. 22 Remove torque converter mounting set bolts. 23 Remove engine mounting set nuts. 24 Remove the engine Wltorque converter. [Point 31 Installation Procedure The installation procedure is the reverse of the removal procedure. Note: Carry out the following job after engine installation:

Air bleeding from fuel system (in diesel engine models only) (See page 1 - 9.) Inching wire adjustment (See Page 10-30.)