Point Operations [Point 1 I Removal~lnstallation: Disconnect the air cleaner inlet side connector as follows: 1. Disconnect the air cleaner case side connector. (1) Hold the connector elbow portion with a hand, and pull downward until the connector protruded portion comes off from the groove on the case side. 2. Disconnect the head guard pillar side connector. (1 Rotate the connector upward and remove when the pillar side notch is aligned with the connector flange protruded portion. 3. Reverse the removal procedure for installation. [Point 31 Removal.lnstallation:
SST 0901 0 - 201 1 1 - 7 1 In the case of the 5K engine, use a sling device (SST 09090 - 0401 0) in addition to the SST above for more efficient operation. Removal: Remove after checking thorough disconnection of the wiring, hoses and cables.