ADJUSTMENT AND OPERATION 1. Inspection and adjustment of engine 1.1 Inspecting and adjusting valve clearance 1.1.1 Preparation for valve clearance inspection (1) Inspect and adjust the valve clearance when the engine is cold. (2) Slightly loosen cylinder head bolts and tighten them to the specified torque in the order as shown in the illustration. Note: Be careful that the tightening torque of cylinder head bolts is different between main bolts and sub bolts.
Cylinder head bolt (main) 73.5 to 83.4N 㨯 m {7.5 to 8.5kgf 㨯 m}[54.2 to 61.5lbf 㨯 ft] Cylinder head bolt (sub) 19.6 to 29.4N 㨯 m {2.0 to 3.0kgf 㨯 m}[14.7 to 21.7lbf 㨯 ft] Tightening order of cylinder head bolts(L2) Cylinder head bolt (main) 73.5 to 83.4 N 㨯 m {7.5 to 8.5 kgf 㨯 m} [54.2 to 61.5 lbf 㨯 ft] 10 11 5 7 8 6 9 4 2 1 3 Cylinder head bolt (sub) 19.6 to 29.4 N 㨯 m {2.0 to 3.0 kgf 㨯 m} [14.7 to 21.7 lbf 㨯 ft] Tightening order of cylinder head bolts(L3) 13-2