. OPERATION OPERATION OPERATION OPERATION REMARK 3 - 115 3. Whe n the material is in a stockpile, keep the cu tting edge of the buck et horizontal; when loading blasted rock, have the bucket tiltin g slightly down ucket. This will mak e the front tire s come off the ground and Try t one o keep the loa side of the bu d in the center of the bucket cket, the load will be unbala At th the l e same time a ift arm to pre s thrusting the bucket into th vent the bucket from goin e material, raise g in too far. By raisi tires If the bu machine little.
Pr cket is thrust t stops movin oper operation oo much and the lift arm st g forward, release the acc of the accelerator pedal for ops rising or the elerator pedal a each type of the soil is eff ective for savi ng of fuel and prevention of wear of the tires. 5. Che ck that there i s enough material loaded into the bucket, then operate the b ucket control lever to tilt the bucket and load the b ucket fully. REMARK cket edge is moved up and down while pushing in the If the bu bucket a nd digging, th e front tires will come off the ground and this 6.
If the re is too much material loaded in the buck et, dump and tilt the bucket quick prevents spillage o ly to remove the excess f the load during hauling. ive load. This