. OPERATION OPERATION DIGGING 4. After loading the rock completely into the bucket, operate the bucket tilt and lift 2 - 3 times repeatedly to fill the bucket. 5. Let back the accelerator pedal, operate the control levers slowly, and tilt the bucket back fully. 6. To prevent the load from falling out of the bucket, after completing the scooping-up operation, operate in the dump and tilt direction when the bucket is near the full tilt to stabilize the load. REMARK If the brakes are operated lightly before traveling in reverse, it is possible to stabilize the load in the bucket.
To prevent generation of heat in the torque converter, keep the standard time for digging to within 10 seconds from the start of pushing in to the completion of scooping up. 3 - 128 NOTICE Do not shift down with the accelerato r pedal depressed (with the engine speed raised). If the transmissi on is shifted down when the engine speed is high, there will b the whole power train. e an excessive load on the engine, torque converter, transmissio n, axles, final drive, and When thrusting the bucket in, shift down to 1st. If the bucket is thrust in at high speed, there will b e an impact load on the machine and this will reduce the ser vice life of the machine.
When shifting down, release the acc elerator pedal to reduce the engine speed before shifting down. Then gradually depress the accelerator pedal. If the accelera on the engine and power train. tor is operated suddenly after shifting down, there will be excess ive load brought to bear Do not carry out operations with the machine articulated. If the machine is articulated, the direction of force will be different on the front wheels and rear wheels.
As will reduce the digging force and brin the power will not be transmitted uni will reduce the service life of the tire a result, the power when traveling will not be transmitted fully to the front wheels, so this g an excessive load to bear on the center hinge pin. In addition, ev en with the front wheels, formly to the left and right wheels. The load will be brought to be ar on one wheel, so this on one side. Do not push the machine in too far. If it is pushed in too far, a high load will be brought to bear on t he machine and this will reduce the service life of the work e quipment and frame. Operate the control lever slowly nea r the end of the bucket tilt operation.
If the control lever is opera ted suddenly, an impact load will be brought to bear on the ti lt cylinder, and there is danger that the cylinder may be damage d. cuts to the tires. When close to pit excavation, do not let the front wheels rise up on the cutting face. This will cause 1. Immediately in front of the rock , let the accelerator pedal back and shift down from 2nd t o 1st. 2. After shifting down, depress th e accelerator pedal gradually and push the rock. 3. Raise the lift arm slightly and in crease the driving force of the front wheels. When doing t his, do not push in too far. REMARK When digging up large rocks, in so me cases it may be better not to raise the lift arm too high.
If the lift arm is raised too high, the rear wheels may com e off the ground.