. OPERATION OPERATION INSTALLING THE BUCKET 3 - 139 Before installing the buc ket, remove all grease, mu d, or sand an d clean the pin, pin hole, and area around the boss (If there is any rust or d irt on the inside surface of the pin hole, use sandpaper and remove it care After cleaning, coat the pin and inside surface of t he pin hol e with fresh grease 1. Set cord ring (2) o diagram. n top of lift arm boss (1) as shown in the sembly of the bucket and adjustment with he After completing as adjustmen t with shims in step 8, mo ve the cord ring down to th e groove. 2. Coat dust seal lip p ortion (3) with grease. 3. Align the left and rig ht bucket pin holes 4.
clearan bucket hinge boss ( 4) and lift arm boss (1) are less than 1.0 to 1.5 mm (0.04 to 0.0 5. Assemble the shim s selected in Step 4, align the pin holes, inge pin (5). o prevent damage to the dust seal when hinge pin. oles, then insert bucket h Coat with grease t inserting the bucket Use a bucket hinge pin that has a grease hole