. OPERATION OPERATION OPERATION OPERATION NOTICE 3 - 140 6. I nstall mo 7. Move cord ring (2) down t o the groove Coat the groove of the cord ring w ith grease before installing it. I f the cord ring i when s installed the bucke while the groove is t is operated and dry, force wil this will cause l be applied t damage to t o the he c cord ord ring ring. 8. Use the sa me procedure as in steps 1 to 7 to install t he b ucket Assemble a pin that has n o grease hole a t the bucke t link 9. Coat the b ucket hinge pin and bucket link pin with grease . For details, s ee "LUBRICATING (P For details of removing an d installing t he bucket, please contac t your Ko matsu distributor.