. MAINTENANCE MAINTENANCE PROCEDURE ADJUST BUCKET CLEARANCE WARNING 4 - 41 It is dangerous if the work equipment moves by mistake w hile the bucket clearance is being adjusted Set t he work equipment on the ground in a stable condition , then stop the engine and lock the lock le 1. Set the work equipm entin the position shown in th e diagram on the right, then stop the engine and set the lock lever to the he linkage and measure the amount of sier of you move the bucket to one side the LOCK position (L). Shift O-ring (1) of t clearance "a". Measurement is ea 2. ide (right side of the dia gram) or the other so all the c learance can be measured in one place.
ance) gauge for easy and accurate Use a gap (clear measurement. 3. Loosen 4 plate mou nting bolts (2), and loosen plate (3). ype, so the operation can be carried out e bolts. The shim is a split t without removing th 4. Remove as many amount "a". A pair thickness of each sh shims (4) corresponding to clearance of shims composes one set and the im is 0.5 mm (0.020 in). In case clearance set and the se clearance amount "a" is smalle (2) for the adjustme r than a shim, do not attempt to tighten bolt nt purpose. s (2). 5. Tighten the four bolt If the bolts (2) are too stiff to tighten, pull out pin st opper bolt (5) for easier tightening .