Komatsu PC210-8, PC210LC-8, PC210NLC-8, PC230NHD-8, PC240LC-8, PC240NLC-8 — Removal and installation of the work equipment assembly

UEN00664-00 50 Disassembly and assembly q Demolition spec. a Insert the resin shim (thickness 1.0mm ) as well as except demolition spec. 1) Ring lifting q Air bleeding Bleed the air from the circuit between the valve and the hydraulic cylinder. For details, see Testing and adjusting, air bleeding of various parts. q Refilling with oil (hydraulic tank) Refill hydraulic oil through the oil filler port to the specified level. Let the oil circulate in the hydraulic system by starting the engine. Then check the oil level again. 2) As running [*3] 2 Inner surface of bushing as assembling the pin: Anti-friction compound (LM-P) 2 Feed grease after assembling pin:

Grease (LM-G) a Adjust the clearance (c) between the foot's end face of boom (13) and bracket (14) to 1 mm or less by use of shims. Thickness of standard shim: 2.0, 2.5, 3.0 and 3.5 mm 4 PC210, 230,240-8