50 Disassembly and assembly UEN00664-00 10. Lift the work equipment Assembly, remove plate (9) and pin (10) at the foot. [*4] Installation q Installation is done in the reverse order of removal. [*1] q Demolition spec. a When tightening the locknut, make sure that 0.5 – 1.5 mm clearance is maintained between the plate and nut after the tightening. q In case to remove using tool V Remove plate (9) and remove pin (10) at the foot using tool V . a Check the number as well as locations of the shims used. [*2] 2 Inside surface of bushing when assembling pin: Anti-friction agent (LM-P) 2 Greasing after assembling the pin:
Grease (LM-G) k When aligning the position of the pin hole, never insert your fingers into the pin hole. a st1:resin shim (thickness 1.0mm ) a Adjust the clearance (b) between cylinder rod (12) and plate (4) to 1.5mm or less using shims: 1.0 and 2.0 mm q Except demolition spec. 11. Remove work assembly (11). 4 Work equipment Assembly: PC210/230-8: 3,300 kg PC210, 230, 240-8 3