50 Disassembly and assembly UEN00665-00 Installation q Installation is done in the reverse order of removal. [*1] a When installing the air conditioner circuit hoses, use care so that dirt, water, may not enter. a Make sure before the installation that there is O ring at the piping connector of the air condi- tioner hose. a Check that there is no defect or deterioration on the O ring. a When connecting the refrigerant piping, coat the O ring with compressor oil for new refriger- ant (R134a) (Denso: ND-OIL8, Zexcel: ZXL100PG (PAG 46 or equivalent)) . 3 Mounting bolt: 8 – 12 Nm {0.8 – 1.2 kgm} [*2] a Make sure that the hoses do not lap over.
q Filling of air conditioning gas By using tool X1 , fill the air conditioner gas (R134a) inside the air conditioner circuit. a Filling quantity: 850 ± 50 g PC210, 230, 240-8 25