UEN00665-00 50 Disassembly and assembly 29. Disconnect the clamp of wiring harness (35). 30. Move plates (36) and (37) together with wiring harness (35) to the boom side. 34. Pull out PPC hose assembly (41) of the work equipment. 31. Open the engine hood and remove cover (38). 35. Sling floor flame assembly (42) and remove it. a Make sure that the hoses, connectors, clamps, and so on are disconnected with- out fail. 32. Disconnect clamp (39). 33. Disconnect PPC hose (40) of the work equip- ment. From the top, the color of the band is: White Brown None Blue Black Green Red Yellow a Prepare an oil sump. 4 Floor frame assembly: 250 kg 24 PC210, 230, 240-8