UEN00160-00 10 Structure, function and maintenance standard 2) When signal current is very small (coil is energized) 3) When signal current is maximum (coil is energized) q When a very small signal current flows to coil (5), coil (5) is energized, and a propulsion force is generated on the left side of plunger (6). q As the signal current flows to coil (5), coil (5) is energized. q When this happens, the signal current is at its maximum, so the propulsion force of plunger (6) is also at its maximum. q Push pin (4) pushes spool (2) to the left, and pressurized oil flows from port (P) to port (C).
q Pressures on port (C) increases and the force to act on surface (a) of spool (2) and the spring load on spring (3) become larger than the pro- pulsion force of plunger (6). q Spool (2) is pushed to the left by push pin (4). q The maximum volume of pressurized oil is conducted from port (P) to port (C), increasing the circuit pressure across EPC valve and the control valve to the maximum level. q Spool (2) is pushed to the right, port (P) is shut off from port (C) and ports (C) and (T) are con- nected. q Since port (T) is closed, pressurized oil does not flow to the hydraulic tank.
q Spool (2) moves up and down so that the pro- pulsion force of plunger (6) may be balance with pressure of port (C) + spring load of spring (3). q The circuit pressure between the EPC valve and the control valve is controlled in proportion to the size of the signal current. 44 PC210, 230, 240-8