UEN00244-00 40 Troubleshooting Circuit diagram related to boom lower PPC pressure switch 58 PC210, 230, 240-8 Trouble (5) Boom lower operation is not displayed normally by monitoring function. Related infor- mation • Monitoring code:
01900 Pressure switch 1 Possible cause and standard value in norma state Cause Defective boom lower PPC 1 pressure switch (Internal dis- connection or short circuit) Disconnection in wiring har- ness (Disconnection in wiring 2 or defective contact in con- nector) s l Ground fault in wiring har- 3 ness (Short circuit with GND circuit) Hot short (Short circuit with 4 24V circuit) in wiring harness 5 Defective pump controller Standard value in normal state/Remarks on troubleshooting a Prepare with starting switch OFF, then start engine and carry out troubleshooting. P02 (male) Right work equipment control lever Resistance Between (1) – (2) Neutral Min. 1 Mz Boom raise Max.
1 z a Prepare with starting switch OFF, then carry out troubleshooting without turning starting switch ON. Wiring harness between C01 (female) (14) – P02 (female) (1) Resis- tance Max. 1 z Wiring harness between P02 (female) (2) – chassis ground (T10) Resis- tance Max. 1 z a Prepare with starting switch OFF, then carry out troubleshooting without turning starting switch ON. Wiring harness between C01 (female) (14) – P02 (female) (1) Resis- M tance in. 1 Mz a Prepare with starting switch OFF, then turn starting switch ON and carry out troubleshooting. Wiring harness between C01 (female) (14) – P02 (female) (1) Voltage Max.
1 V a Prepare with starting switch OFF, then start engine and carry out troubleshooting. C01 (female) Right work equipment control lever Resistance Between (14) – chas- sis ground Neutral Min. 1 Mz Boom raise Max. 1 z