50 Disassembly and assembly UEN00661-00 a PC240LC-8, PC240NLC-8 7. No. 2 sun gear Install No. 2 sun gear (12). 8. Ring gear Using eyebolt (M10 x 1.5), install ring gear (13). a De-grease mating face of ring gear (13) and case (30). a Not to adhere gasket sealant in mating face of the ring gear and the case. a Align the counter mark on the ring gear (Portion c ) and the convex portion on the case flange (Portion d ) in the position illustrated in the following figure, and then install it. 10. No.1 carrier assembly 1) Assemble No. 1 carrier assembly as fol- lows. 1] Press fit shaft (11) into career (34) in the arrow direction (1st) until the slot on the snap ring can be seen.
2] After installing snap ring (35), push back (to the 2nd direction) from the opposite side until the snap ring adheres to the carrier P surface. Be careful no to push too much. 3 mounting bolts: 157 – 196Nm {16 – 20 kgm} 9. Install O ring (37). q Input pin press (reference): 11.2 – 25.8 kN {1,140 – 2,630 kg} a PC210-8, PC210LC-8, PC210NLC-8, PC230-8 PC210, 230, 240-8 29