50 Disassembly and assembly UEN00661-00 12. Swing motor Assembly Put Swing motor Assembly (2) on ring gear (13). 13. Confirm mounting angle of elbow for drain (38): 15°and the tightening torque. 3 Elbow mounting nut: 128 – 186 Nm {13.0 – 19.0 kgm} 4 Swing motor Assembly: 70 kg a De-grease mating face of swing motor Assembly (2) and ring gear (13). a Not to adhere gasket sealant in mating face of swing motor Assembly (2) and ring gear (13). a After aligning the position of swing motor Assembly (2) and ring gear (13) as follows and install them. 3 mounting bolts: 59 – 74 Nm {6.0 – 7.5 kgm} a PC210-8, PC210LC-8, PC210NLC-8, PC230-8 14. Install the drain hose.
a As installing the hose, be careful that the drain plug to be downward. q Align the relation between the positions of the filler ( f section) and convex portion of the case ( d section) as mentioned in the drawing and install them.( c,d : Above- mentioned) 3 Drain hose: 128 – 186 Nm {13.0 – 19.0 kgm} 15. Oil refill Fill the power line oil( TO30 ) from oil filler port up to the standard level by tightening the drain plug. 3 Drain plug: 19.6 – 24.5 Nm {2.0 – 2.5 kgm} 5 Swing machinery case: Approx. 6.7 l q Align the relation between the positions of the motor port ( g section) and convex por- tion of the case ( d section) as mentioned in the drawing and install them. ( c,d :
Above-mentioned) a PC240LC-8, PC240NLC-8 PC210, 230, 240-8 31