Komatsu PC210-8, PC210LC-8, PC210NLC-8, PC230NHD-8, PC240LC-8, PC240NLC-8 — Expansion and installation of track shoe assembly

50 Disassembly and assembly UEN00662-00 Expansion and installation of track shoe assembly 4. Using tool R , remove master pin (2). [*2] a Press fit guide pin (GP), so that master pin (2) will be pushed out. Special tools Development of track shoe 1. Turn the upper structure by 90 degrees. 2. Loosening lubricator (1), slacken the tension of track shoes. [*1] k Since the inner pressure of adjusting cylinder is extremely high, never loosen the lubricator more than one turn. If the grease does not come out smoothly, move the machine back and forth. 5. Set the location of guide pin (GP). 1) Pushing against ground with the work equipment, lift the track shoes.

2) Take away blocks [1] under both track shoes at idler and sprocket. 3) Bring guide pin (GP) at the front of the idler. 4) Relieve the work equipment, and lower the machine body. 5) Set block [1] under track shoe (3) at front of the idler. 3. Set the location of master pin (2). 1) Pushing against ground with the work equipment, lift the track shoes. 2) Locate master pin (2) at around the center of lower track shoes and between two track rollers. 3) Set blocks [1] under both track shoes at idler and sprocket. PC210, 230, 240-8 13 Symbol Part number Part name Necessity Q’ty N/R Sketch R 791-630-3000 Remover and installer t 1 790-101-1300 Cylinder (980kN{100ton}) t 1 790-101-1102 Pump t 1