Komatsu PC210-8, PC210LC-8, PC210NLC-8, PC230NHD-8, PC240LC-8, PC240NLC-8 — Expansion and installation of track shoe assembly

UEN00662-00 50 Disassembly and assembly 6. Pull out guide pin (GP), and drive the machine back slowly to lay track shoes (3) down. [*3] a Put some blocks between upper track shoes and the track frame to prevent dam- ages. Installation of track shoe q Installation is done in the reverse order of removal. [*1] a Refer to the Inspection and Adjustment of Track Shoe Tension section in the Testing and adjust- ing chapter of this manual. [*3] 1) Using bar [2], roll up track shoes (3) while the machine drives forward slowly. [*2] 7. Apply grease on master pin (2). (At the area where bushing (4) and master pin (2) come contact: shown hatched) 2 Between the bushing and the master pin (shown hatched):

Grease Nigutaite LYK-2 from nihon grease co.,ltd.: part no.44392708. 2) Latter half of the operation, use a fork lift or the work equipment, to pull wire [3] to fix the track shoes. a When replacing dust seals, apply some grease on the end surfaces of bushing and the contact surface (B) of dust seals. 2 Contact surface (B portion) between bushing and dust seal: Grease Nigutaite LYK-2 from nihon grease co.,ltd.: part no.44392708. a Press fit master pin (2) and push guide pin (GP) out. a Using tool R , press fit the master pin, so that the protrusion amount a of master pin (2) will be the dimension designated below. Protruding amount of the master pin a : 2.5 ± 1 mm 14 PC210, 230, 240-8