50 Disassembly and assembly UEN00662-00 Removal and installation of counterweight assembly Installation q Installation is done in the reverse order of re- moval. Removal 1. Remove mirror (1). 2. Sling counter weight assembly (2) temporarily. [*1] 2 Mounting bolt threaded section: Adhesive compound (LT-2) 3 mounting bolts: PC210/230: 1,960 – 2,450 {200 – 250 kgm} PC240: 1,180 – 1,470 Nm {120 – 150 kgm} [*2] a Installing and adjusting counterweight 1) Using shims, adjust the differences in level or gaps between the counter weight and the exterior of body work.
a Shims:20Y-46-11410 2) Fix the counter weight so that the clear- ances in the direction of front and rear are even and within the limit of 10±5mm for both from the doors and from the revolving frame. 3. Remove 4 pcs. of mounting bolt (3). [*1] a Record the locations where the shims were used. 3) The difference in level in left to right direc- tion between the exterior of the door (D) and the counter weight (C) a : 10 ± 4 mm The difference in level in left to right direc- tion between the revolving frame (R) and the counter weight (C) b : 5 mm or less The difference in level in up and down direction between the exterior upper cover (UC) and the counter weight (C) c :
0 ± 5 mm are the respective limits for the mounting adjustment. a Rear view (Enlarged drawing for right hand side) 4. Sling take counter weight assembly (2) off. [*2] a Be careful not to bump it against the engine or radiator or cooler assembly. 4 Counter weight assembly: 4,000kg (PC210/210LC-8) 4,300kg (PC210NLC/230-8) 5,250kg (PC240LC/240NLC-8) PC210, 230, 240-8 17