UEN00662-00 50 Disassembly and assembly 7. From center swivel joint assembly, disconnect 6 hoses (8) – (13). q (8): Center swivel joint (D port) – Swing motor (T port) q (9): Center swivel joint (E port) – solenoid valve q (10): Center swivel joint (B port) – L.H. travel control valve (A2 port) q (11): Center swivel joint (D port) – R.H. travel control valve (B5 port) q (12): Center swivel joint (A port) – L.H. travel control valve (B2 port) q (13): Center swivel joint (C port) – R.H. travel control valve (A5 port) 8. Pull out pin (14) on the center swivel joint, and detach jam plate (15) from the center swivel joint. Installation q Installation is done in the reverse order of removal.
[*1] 2 Swivel circle mating surface: Gasket sealant (LG-1) 2 Thead of revolving frame mounting bolts: Adhesive compound (LT-2) q In case of torque tightening: 3 mounting bolts: 716 – 814 Nm {73 – 83 kgm} q In case of angle tightening: 3 mounting bolts: 1) Initial torque: 294.2 ± 29.4 Nm {30 ± 3 kgm} 2) Then tighten the bolts turning by 60 ± 6°. 9. Remove 32 mounting bolts, and dismount revolving frame assembly (16) off slinging it up. [*1] a Using levers and blocks, hold the balance of revolving frame assembly front and rear, and left and right. q Refilling with oil (Hydraulic tank) Refill hydraulic oil through the oil filler port to the specified level.
Let the oil circulate in the hydraulic system by starting the engine. Then check the oil level again. k When dismounting the revolving frame assembly, take care so that it does not hit the center swivel joint assembly. q Air bleeding Bleed air from the travel motor referencing the Air Bleeding of Various Parts section in the Testing and adjusting chapter of this manual. 4 Revolving frame assembly PC210/230-8 : 5,100kg PC240-8 : 5,500kg 16 PC210, 230, 240-8