UEN00663-00 50 Disassembly and assembly 33. Remove mounting bolt, and lift off control valve assembly (47) to remove. Installation 4 Control valve assembly: 260 kg q Installation is done in the reverse order of re- moval. q Refilling with oil (hydraulic tank) Refill hydraulic oil through the oil filler port to the specified level. Let the oil circulate in the hydraulic system by starting the engine. Then check the oil level again. 5 Hydraulic tank: Approx. 234 l (PC210, 230) Approx. 239 l (PC240) 3 Hydraulic tank drain plug: 58.8 – 78.5 Nm {6.0 – 8.0 kgm} q Air bleeding Bleed the air from the circuit between the valve and the hydraulic cylinder.
For details, see Testing and adjusting, air bleeding of various parts. 12 PC210, 230, 240-8