. MAINTENANCE MAINTENANCE PROCEDURE MAINTENANCE MAINTENANCE PROCEDURE loose, shown in the diagram on the right. nut and shoe are in close contact 4 - 26 13. Dr ain the coola nt from s ub tank (5), wash the inside o f the sub k, the n add water to between th e FULL a nd LOW marks. 14. St op the engin e, wait fo r approx. 3 minutes, add city wate r up near th e mou th of the filler port, th en tighte n radiato r cap (2). CHECK AND TIGHTEN TRACK SHOE BOL If the machi ne is u sed with track sho e bolts (1 break, so tighten a ny loose they will Tightening 1.
Fir st, tighten to a tighten ing torque of 392 ± 3 9.2 N·m (40 ± 4 kgf ·m, 289.3 ± 28.9 lbft), t hen check that the nut an d shoe are in tight co ntact with t he link ma ting surface. 2. Aft er checking, tighten a further 12 0° ± 10°. Order for Tightenin Tighte n the b olts in After ti ghtening, ch eck that with th e link mating surface.