Doosan Infracore D18NAP — Procedure of Assembling Engine

6. About the engine 3) Tighten 6 fixing bolts (B) at a tightening torque of CAUTION 2.2 kgf m. Be careful to note the direction when attaching the gasket. Be careful not to damage the gasket while attaching it. 42. Attach the oil level gauge. 2) Tighten 3 flange hex bolts (B) at a tightening torque of 2.2 kgf m. C 3) Attach the boost pressure sensor (C). 4) Tighten the flange hex bolt (D) at a tightening A torque of 1.0 kgf m. 41. Attach the EGR connection pipes. B A EDL013003A 1) Attach the oil level gauge guide tube (A) in the cylinder block. 2) Tighen the flange hex bolt (B) at a tightening 3) Insert the oil level gauge (C). torque of 1.0 kgf m.

B CAUTION EDL013004A Make the handle of the oil level gauge face the reverse direction from the center of the engine. 1) Attach 4 gaskets. 2) Attach the EGR pipes (A) CAUTION Be careful to note the direction when attaching the the EGR connection pipe. Be careful not to damage the gasket while attaching it. 6 - 40