Doosan Infracore D18NAP — Assembly of EGR Valve

10. Intake/Exhaust System 3. Attach the oil filter assembly. 2) Temporarily tighten 2 collared hex bolts (B) by hand. 3) Temporarily connect the fuel injection pipes (C) and (D) by hand. D . CAUTION C Do not bend the fuel injection pipes by force. Be careful to note the direction when connecting the fuel injection pipes. Assemble the nut on one side of the fuel injection pipe first, and then the nut on the other side to connect the round part of the pipe to the correspondent part correctly. Do not reuse fuel injection pipes but replace them with new ones.

Reusing fuel injection pipes may allow foreign substances into the fuel pipes or oil leaks from the bolt clamping to occur, causing a critical fault in engine performance. A B EDL01300 9 A 1) Attach the 3 O-rings and the oil filter assembly (A). 2) Tighten 5 flange hex bolts (B). 3) Connect the coolant hose (C) 4) Tighten the fixing bolt (D). 4) Tighten 2 collared hex bolts(B) at a tightening torque of 2.2 kgf•m. CAUTION 5) Tighten the fuel injection pipes (C) and (D) at a tightening torque of 3.0 kgf•m. Make sure that the O-rings have been mounted. Be careful not to damage the O-rings while mounting them. 6) Tighten the fixing bolt (E). 5. Attach the intake stake. 4.

Attach the common rail and the injection pipe. C D C A A B B E D EDL013005A 1) Attach the gasket and the intake stake(A). EDL013006A CAUTION 1) Attach the common rail (A) to the intake manifold. Be careful to note the direction when attaching the gasket. Be careful not to damage the gasket while attaching it. CAUTION Be careful to note the direction when attching the common rail. Be careful not to damage the common rail while attaching it. 2) Tighten 3 flange hex bolts(B) at a tightening torque of 2.2 kgf m. 3) Attach the boost pressure sensor(C). 10 - 26