DISASSEMBLY AND ASSEMBLY SWING MACHINERY • SWING MOTOR REMOVAL OF SWING MACHINERY • SWING MOTOR ASSEMBLY Release the remaining pressure in the hydraulic cir- cuit. For details, see TESTING AND ADJUSTING, Releas- ing pressure in hydraulic circuit. 1. Disconnect hose (1). 2. Disconnect swing motor inlet and outlet hoses (2), (3), and (4). 3. Remove mounting bolts, sling swing machinery and swing motor assembly (5), then use forcing screw to remove. # When removing the swing machinery and swing motor assembly, lift off slowly and be careful not to damage the wiring or piping. 1 Swing machinery - swing motor assembly: 110 kg.
INSTALLATION OF SWING MACHINERY - SWING MOTOR ASSEMBLY Carry out installation in the reverse order to removal. 1 Mating surface of swing machinery case: Gasket sealant (LG-4 or LG-6). Swing machinery, swing motor assembly mounting bolt: 276.9 ± 31.9 Nm (28.25 ± 3.25 kgm). Refilling with oil (hydraulic tank) # Add oil through the oil filler to the specified level. Run the engine to circulate the oil through the system. Then check the oil level again. Bleeding air # Bleed the air from the swing motor. For details, see TESTING AND ADJUSTING, Bleeding air. 30-21