DISASSEMBLY AND ASSEMBLY CONTROL VALVE DISASSEMBLY OF CONTROL VALVE ASSEMBLY 5. Bucket control valve, arm control valve, boom control valve, swing control valve 1) Remove case (27), then remove spring (28) and retainer (29). 2) Remove spool assembly (30). # Do not disassemble spool (30). 3) Remove case (31), then remove spring (32) and retainer (33). # To avoid assembling spring (32) in mistake for spring (39), mark with tags. # The set pressure of the safety valve and arm counterbalance valve, cannot be adjusted when they are installed on the machine, so do not disassemble. The following explanation describes the stand- ard 6-spools control valve. 1.
Main relief valve Remove main relief valve (1). 6. Travel control valve, stabilizer control valve 1) Remove case (34), then remove spring (35) and retainer (36). 2) Remove spool assembly (37). # Do not disassemble spool (37). 3) Remove case (38), then remove spring (39) and retainer (40). # To avoid assembling the spring of the control valve in Step 5 in mistake for spring (39), mark with tags. 2. Unload valve, safety-suction valves, suction valves 1) Remove unload valve (3). 2) Remove safety-suction valves (4), (5), (6), (7), and (8). 3) Remove suction valves (9) and (10). 3.
Pressure compensation valves # Before removing any pressure compensa- tion valve, check and mark its mounting po- sition. 1) Remove bucket CURL pressure compen- sation valve (11), arm IN pressure com- pensation valve (12), boom LOWER pres- sure compensation valve (13), travel RE- VERSE pressure compensation valve (14), stabilizer RETRACT pressure compensa- tion valve (15), and swing RIGHT pressure compensation valve (16). # After removing the pressure compen- sation valves, remove check valve (17) from each pressure compensation valve mount.
2) Remove bucket DUMP pressure compensation valve (18), arm OUT pressure compensa- tion valve (19), boom RAISE pressure compensation valve (20), travel FOR- WARD pressure compensation valve (21), stabilizer EXTEND pressure compensa- tion valve (22), and swing LEFT pressure compensation valve (23). # After removing the pressure compensation valves, remove check valve (24) from each pressure compensation valve mount. 7. Arm counterbalance valve, check valve, cover 1) Remove arm counterbalance valve (41). 2) Remove flange (42), then remove spring (43) and check valve (44). 3) Remove covers (45) and (46). 8.
Lift check valve Remove case (47), then remove spring (48), piston (49), and sleeve (50). 9. Cooler bypass valve Remove case (51), then remove spring (52), piston (53), and sleeve (54). 4. LS shuttle, LS select valve Remove LS shuttle valves (25a) and (25b), and LS select valve (26). # Mark the mounting positions of LS shuttle valves (25a), and (25b), and be careful not to make any mistake when installing. 30-81