Komatsu — REMOVAL OF OPERATOR'S CAB ASSEMBLY

DISASSEMBLY AND ASSEMBLY OPERATOR'S CAB 9. Remove divider board (13). 10. Remove heater duct of air conditioner ducts (14) and (15) (if fitted). 11. Disconnect wiring connectors CN-H01 (16), CN-H02 (17), CN-H03 (18), CN-H04 (19), CN-H05 (20), CN- H06 (21), CN-K01 (22), CN-H07 CN-H08 CN-H09. 12. Disconnect heater cables or air conditioner cables (24) (if fitted). 30-128