Komatsu — INSTALLATION OF COUNTERWEIGHT ASSEMBLY

DISASSEMBLY AND ASSEMBLY COUNTERWEIGHT REMOVAL OF COUNTERWEIGHT ASSEMBLY 1. Remove counterweight top cover. 2. Set eyebolts to counterweight assembly (1), and sling. 3. Remove 4 mounting bolts (2), and lift off counter- weight assembly (1). 1 Counterweight assembly: 2,150 kg. INSTALLATION OF COUNTER- WEIGHT ASSEMBLY Carry out installation in the reverse order to removal. 1 Thread of counterweight mounting bolt: Thread tightener (LT-2) Counterweight mounting bolt: 1,324 ± 147 Nm (135 ± 15 kgm) # When installing the counterweight, adjust so that the stepped difference and the clearance from the bodywork is uniform on the left and right. 30-130