Yamaha Exciter II-570 — Engine Assembly and Adjustment

ENGINE ASSEMBLY AND ADJUSTMENT I ENG I ~ I Before installing and torquing the crankcase bolts, be sure to check whether the crankshaft is turning smoothly. 6. Tighten: • Bolts (crankcase) NOTE: ________________________ _ Tighten the bolts in order starting with the smallest number and torque the bolts in two stages. Bolt (crankcase): First: 13 Nm (1.3 m· kg, 9.4 ft· Ib) Final: 27 Nm (2.7 m • kg, 19 ft· Ib) Bolt (engine bracket): 27 Nm (2.7 m • kg, 19 ft· Ib) 7.Apply: • 2-stroke engine oil (to crankpin, bearing and oil delivery hole) 5-16 http://ReadManuals.com