PRIMARY SHEAVE AND DRIVE V-BELT 1~141 INSTALLATION Reverse the "REMOVAL" procedure. Note the following points. 1. Install: • Primary sheave assembly Be sure to remove any oil and/or grease from the tapered portion of the crankshaft and spider using a cloth dampened with thinner. 2.Apply: • YAMALUBE 2-cycle oil/equivalent grease (to threads of primary sheave bolt) 3. Tighten: • Bolt (primary sheave) CD Tightening steps: • Hold the primary sheave@usingthe Primary Sheave Holder (90890-01701,YS-01880)@ and tighten the bolt (primary sheave) to speci- fication. Bolt (primary sheave): (initial tightening) ....... ;;;;;;;;a"...
120 Nm (12 m • kg, 87 ft • Ib) • Loosen the bolt (primary sheave) completely. • Retighten the bolt (primary sheave) to specifi- cation. Bolt (primary sheave): 60 Nm (6.0 m • kg, 43 ft • Ib) 4. Install: • Drive V-belt NOTE: ______________________ __ Before installing the V-belt, clean the oil off the fixed sheaves and sliding sheaves using a cloth dampened with thinner. 4-9 http://ReadManuals.com