24. SERVICE PROCEDURE 24.4 EVERY 100 HOURS SERVICE 24.4.1 LUBRICATING The minimum greasing interval is 100 hours. However, more frequent greasing will be required depending on con- ditions/environment. 1. Set the work equipment in the greasing posture below, then lower the work equipment to the ground and stop the engine. 2. Using a grease pump, pump in grease through the grease fittings shown by arrows. 3. After greasing, wipe off any old grease that was pushed out. 1. Boom cylinder foot pin (2 points) 2. Boom foot pin (2 points) 3. Boom cylinder rod end (2 points) 4. Arm cylinder foot pin (1 point) PC290-ENG 3-51