12. OPERATION 3. Set the safety lock lever c to the FREE position, and raise the bucket from the ground. 4. (Mono Boom) Operate bucket control lever v and arm control lever b slowly to move the bucket cylinder and arm cylinder to the end of the stroke. 4-A (Two Piece Boom) Left equipment control lever This is used to operate the arm and swing. Arm operation Direction A : Arm OUT Direction B : Arm IN Swing operation Direction C : Right swing Direction D : Left swing N position (Neutral): The swing and arm are stopped and held in the same position. 4-B (Two Piece Boom) Right work equipment control lever This is used to operate the boom and backhoe bucket. Boom operation Direction 1 :
1 ST Boom RAISE Direction 2 : 1 ST Boom LOWER Backhoe operation Direction 3 : Bucket DUMP Direction 4 : Bucket CURL N. Position (Neutral): The boom and bucket are stopped and held in the same position. Caution Before starting the excavator, push the horn 5 on the control lever. PC290-ENG 2-53