. OPERATION OPERATION LEVELING OPERATIONS reverse when carrying out leveling OFF when carrying out leveling PUSHING OPERATION CAUTION Never set the bucket to the DUMP position when carrying out pushing operation. LOAD AND CARRY OPERATIONS WARNING bucket to lower the center of gravity or the work equipment is raised, the (if equipped) is turned ON, the work the travel damper is actuated, the 3 - 100 NOTICE Always operate the machine in operations. If it is necessary to carry out level do not set the bucket-dump angl If it is necessary to carry out level do not set the bucket-dump angl Turn the E.C.S.S. switch (if equi operations. 1. Scoop soil into the bucket.
Move the machine backward while et little by little. spreading soil from the buck 2. Go over the spread soil with the bucket teeth touching the ground and level the ground 3. Scoop some more soil into t he bucket, put the lift arm control lever in FLOAT position, lev level, and smooth the groun d by moving backward. When carrying out pushing ope rations, set the bottom of the bucket parallel to the ground s When carrying a load, lower the when traveling. When the machine is traveling moment that the E.C.S.S. switch equipment will move. If operations are carried out with the ON position, the moment th work equipment will move.
The load and carry method for wheel loaders consists of a cycle of scooping -> hauling -> truck, etc.). perly maintained. Always keep the travel path pro When using the load and carry m ethod, see "PRECAUTIONS FOR USING LOAD AND CA 3-111)".