John Deere 450CLC Excavator — Install Boom, Arm, Bucket and Counterweight

Miscellaneous—Machine Assembly 12. Connect hoses (A and B) to the tubes on boom as follows: Outside hose (A) to outside left boom tube Inside hose (A) to inside left boom tube Outside hose (B) to outside right boom tube. Inside hose (B) to inside right boom tube T6912AK —UN—28OCT88 13. Attach guard. 14. Start engine. IMPORTANT: Cylinder rod seal friction burn damage may result if cylinder is cycled too rapidly when removing air from circuit. 15. Run engine at slow idle. Operate hand controller slowly to extend and retract boom cylinders completely. A—Hose B—Hose 16. Cycle each cylinder slowly a minimum of six times to remove air from circuit. 17.

Repeat last step to remove air from cylinder circuit. TX,111,DY2446 -19-31MAY01-10/19 CAUTION: The approximate weight of boom cylinder rod end pin is 94 kg (206 lb). Specification Boom Cylinder Rod End Pin—Weight....................................................................... 94 kg (206 lb) 18. Remove four cylinder rod end-to-boom cap screws and retaining ring from one side of boom pin. T6912AF —UN—28OCT88 19. Drive pin in until flush with exterior boss. 20. Attach hoist to cylinder. 21. Raise cylinder into position. Operate hand controller to align rod end with pin. 22. Insert pin. Install retainer and cap screws. TX,111,DY2446 -19-31MAY01-11/19 23. Attach lubrication hose (A). 24.

Repeat procedure for opposite cylinder. 25. Install light on bracket located on left side of boom. A—Lubrication Hose T6912AG —UN—28OCT88 Continued on next page TX,111,DY2446 -19-31MAY01-12/19 4-2-4 060313 PN=136