John Deere 450CLC Excavator — Install Boom, Arm, Bucket and Counterweight

Miscellaneous—Machine Assembly 26. Connect black (ground) wire (A) from light to black (ground) wire (C) attached to the bracket. Connect the red (HOT) wire (B) into the harness on boom. A—Black Ground Wire B—Red (HOT) Wire C—Black Ground Wire T6912AH —UN—28OCT88 TX,111,DY2446 -19-31MAY01-13/19 27. Connect boom work light wiring harness (A). A—Boom Work Light Wiring Harness T6907AA —UN—27OCT88 TX,111,DY2446 -19-31MAY01-14/19 CAUTION: The approximate weight of arm with bucket cylinder is 2540 kg (5,600 lb). Specification Arm With Bucket Cylinder—Weight........................................................ 2540 kg (5,600 lb) 28. Lift arm assembly into position.

Align arm pin hole (B) with boom pin hole (A). T6912AM —UN—28OCT88 CAUTION: The approximate weight of arm-to-boom pivot pin is 61 kg (135 lb). Specification Arm-To-Boom Pivot Pin —Weight............................................................................. 61 kg (135 lb) A—Boom Pin Hole B—Arm Pin Hole 29. Insert pin. Add shims as required, add pin retainer, tighten cap screws. Continued on next page TX,111,DY2446 -19-31MAY01-15/19 4-2-5 060313 PN=137