John Deere 450CLC Excavator — Track Gauge Transport Position Adjustment

Operation—Operating the Machine 19. Install shims (E), plates (C), lock plates (G), and cap screws (F) to counterweight bosses. 20. Bend one top and one bottom corner of lock plates (G) against heads of cap screws (F). NOTE: Replace lock plate if damaged. 21. Tighten counterweight-to-frame cap screws (A). Counterweight—Specification Counterweight-To-Frame Cap Screw—Torque............................................... 2400 N·m (1740 lb ft) 22. Tighten or loosen cap screws (A) if necessary to install quick lock pins to nut (B). 23. Close shut off valve. 24. Install machine mainframe bottom access covers and counterweight top cover.

A—Counterweight-To-Frame Cap Screw B—Nut C—Plate D—Counterweight E—Shim F—Cap Screw G—Lock Plate T8172AD —UN—20FEB94 Counterweight Hardware DW90712,000017B -19-29JUN06-6/6 Track Gauge Transport Position Adjustment CAUTION: Do not loosen side frame STOP cap screws (E). 1. Remove 18 cap screws (nine cap screws from each of the track frame supports) of the side frame to be retracted. T6912AW —UN—07APR89 2. Swing upper structure perpendicular to side frame. A—Side Frame Step B—Side Frame C—Track Frame D—Stop E—Stop Cap Screw F—Track Frame Cap Screw Continued on next page DW90712,000017C -19-29JUN06-1/3 2-2-20 060313 PN=60