SECTION 4 OPERATING Page 42 LOADER TECHNIQUES Fig. 4.38."V" Loading Method Fig. 4.39. Step Loading Method Approach the bank or stockpile with the engine at full governed speed. Keep the bucket flat, working into the material at or near ground level. As the bucket penetrates the material, raise the bucket slightly. When the material boils to the top of the spillboard, roll the bucket all the way back, raise the bucket to provide ground clearance and, at the same time, disengage the forward travel of the loader as shown in Fig. 4.38. Back away in an arc from the bank or stockpile as show in Fig. 4.38 and 4.39 just far enough to allow turning of the loader for the approach to the truck.
Digging in hard material can be aided by "wiggling" the bucket edge immediately after penetration. Operate the bucket control lever alternately between the roll back and dump positions. This action will loosen the material and improve bucket loading. Coordinated operation of the two hydraulic control levers as the bucket enters the material will yield satisfactory bucket loads. The boom assy need not be fully raised to dump the bucket. Adjust the dump height to the height of the side of the loaded vehicle. NOTE: The boom assembly need not be fully raised to load the bucket. Maximum bucket loading can be obtained before the bucket reaches the operator’s eye level.
Approach the bank or stockpile with the engine at full governed speed. Keep the bucket flat, working into the material at or near ground level. As the bucket penetrates the material, raise the bucket slightly. When the material boils to the top of the spillboard, roll the bucket all the way back (Fig. 4.40 and 4.41). Raise the bucket to provide ground clearance and, at the same time, disengage the forward travel of the loader. Back away in an arc from the bank or stockpile as shown in Fig. 4.38 and 4.39 just far enough to allow turning of the loader for the approach to the truck. Fig. 4.40. Bank Loading (Working into Material) OM515C520C99/1E DRESSTA