John Deere Omar287594 — Hitch Conversion—Convertible Quick Coupler

Hitch Adjusting Implement Level RXA0098642 —UN—16JUL08 RXA0098643 —UN—16JUL08 A—Locking Ring B—Handle C—Center Link Adjustment Length D—Collar E—Center Portion F—Lift Link Adjustment Length 1. Adjust center link to level implement front­to­rear. Remove Locking Ring (A). Lift Handle (B). Rotate center portion of center link to desired position. 4. Adjust lift links to level implement side­to­side. Slide collar (D) upward. Rotate center portion (E) of lift link to desired position. Lift Link Length—Specification Adjustment—Category 3/3N Length..............................................................................

1004—1143 mm (39.5—45 in.) Category 4 Length........................................................... 966—1137 mm (38—44.8 in.) 2. Secure handle with locking ring. 3. Measure between centers of pins (C). Center Link—Specification Adjustment—Category 3 Length ..................................... 690—834 mm (27.2—32.8 in.) Category 4 Length........................................................... 681—831 mm (26.8—32.7 in.) 5. Lock out lateral float. 6. Secure collar in position. OURX935,00003D9 ­19­16JUL08­1/1 Changing Lateral Float Put lateral float pins in upper holes (A) to hold implement rigidly.

Put lateral float pins in lower holes (B) to allow either draft link to raise slightly as implement follows ground surface. RXA0052502 —UN—18OCT01 RXA0052503 —UN—18OCT01 A—Upper Holes B—Lower Holes OURX935,00004BC ­19­02JAN08­1/1 50­17 122208 PN=136