daewoo Solar 140LC-V — Preliminary Work Machine Setup for Maintenance

PRELIMINARY WORK MACHINE SETUP FOR MAINTENANCE When performing maintenance specified in this manual, always park the excavator as follows. NOTE: Certain types of maintenance may require the machine to be positioned differently. Always return machine to this position. 1. Park on firm, level ground. 2. Lower bucket to ground. HAOB920L Figure 5 3. Set safety lever on "LOCK" position. HAOA390L Figure 6 4. Allow engine to run at low idle for a minimum of 5 minutes to allow engine to cool. If this is not done, heat surge may occur. HAOB290L Figure 7 022-00058E Operation and Maintenance Manual Inspection, Maintenance and Adjustment 4-3