3-POINT HITCH AND DRAWBAR THE 3-POINT HITCH SETUP 9.2 Adjusting lower link width 1. Set the width (W1) of lower links to be the same as width (W2) of the implement. Details regarding the adjustment of the width (W1) of lower links can be found in a different section. (See Stabilizer - turnbuckle type on page 73.) (1) Top link (2) Lower link (3) Latch (4) Release lever (A) “LOCK” position (B) “UNLOCK” position 9.4 Detaching implement from tractor (1) Lower link (2) Telescopic stabilizer (3) Implement 1. Fully lower the implement to the ground. Support the implement with parking stand (if equipped).
If necessary, adjust the top link and or lifting rod length so that the implement may stabilize on the ground. 2. Detach the top link from implement. Hook the top link in the top link support. 3. Pull the release levers on both lower links to release the quick hitches from implement ball-joints. The latches will disengage and allow the lower links to lower and detaching the implement. 9.3 Attaching implement to tractor 1. Set the release lever on the quick hitches to position, if its lever is in “UNLOCK” position (self-locking latches are closed). 2. With the lower links fully lowered, reverse the tractor until the quick hitches are beneath the implement ball-joints. 3.
Raise the lower links using the hydraulic control lever until the quick hitches engage the ball-joints. DRAWBAR NOTE : An audible click will be heard as the self- locking latches engage the implement ball- joint. WARNING To avoid personal injury or death: Never pull from the top link, the rear axle or any point above the drawbar. Doing so could cause the tractor to tip over rearward. 4. Connect the top link to the implement. If necessary, adjust the top link length. 76 M5091N, M5101N