. OPERATION OPERATION FINISHING LEFT ROAD SHOULDER 1. Operate the drawbar shift cylinder to set the circle to the left end. 3 - 139 2. Set s o that the left end of the blade i s in li ne w ith the outsid e of the le ft tire . Set the blade so that the soil i s discharge d between the 2 wheels. (Th e soil can be mor blade is at a small propulsion angle 3. Align the center of the machine the ditch. with discharge d when digging the 4. Operate th e left an d right blade lift c ylinders t o keep the b lade horizontal and at t he desired diggin g depth. 5. Lean the f ront wh eels slightly to the righ