. OPERATION OPERATION 3 - 140 CONSTRUCTING ROAD - METHOD OF MAKING V-DITCH The procedure shown i n the diagram s is for one side of the road. Repeat the same operation on of th e road. Whe n carrying out Ste ps 4 and 7, ar ticulate the frame. 1. L ine of d itch: Light- duty digging Determine the lin e of the ditch along the measured points. : approxim ately 50 mm (2.0 in) l speed: ap proximately 2 km/h (1.2 MPH) 2. S econd digging pa ss: Heavy-du ty digging 3. T hird digging pass: Heavy-duty digging 4. F inishin g road sho