. OPERATION OPERATION 3 - 145 CONSTRUCTING ROAD - METHOD FOR MAKING FLAT-BOTTOMED DITC The procedure shown in the diagrams is for one side of the road. Repeat the same o peration on the op posite of the road 1. Make t he slope face on the inside flat. 2. Dig the width and depth of the bottom of the ditch with the left ditchin g method . 3. Finish t he road shoulder 4. Spread th e soil to the center.