. OPERATION OPERATION OPERATION OPERATION 3 - 144 7. Lean the front wheels to the left. D ig the second V-groove (2) at the same de pth or slightly deepe r than the first V-groove (1). 8. Dig the flat bott om. Set the right bla de lift c ylinder t o the desired depth. 9. Operate the lef t blade lift cylinder 10. Set the front rig ht tire at the bottom of the first V-d itch and s tart the operation. 11. Set the right ed ge of the blade at t he bottom of t 12. Lower the right blade lift cylinder s o that the tip o f the blad e is the set precisio 13. Lower the left lif t cylinder to the des ired digging de pth. Lean the front wheels to 14.
Set the blade a t an acute angle an d pus h up the soil to the top of 15. Spread the win drow and finish to t he fina l precisi