. OPERATION OPERATION OPERATIONS AND CHECKS AFTER STARTING ENGINE WARNING BREAKING IN THE NEW MACHINE CAUTION WARMING UP OPERATIONS speed from time to time. at 3 - 87 If th ere has been any abnormal actuation or trouble, turn the starting switch key to the OFF positi If th e work e quipmen t is operated without w arming the machine up sufficiently, the response of the work equipment t o the vement o f the con trol lever will be slow a nd the work equipment m ay not r espond as the operat or desires, so always carry the warming-up o peration.
Particularly in cold areas, be sure to c arry out the warm-up operati on completely Your K omatsu machine has been thoroughly ad justed and tested before shipment. H owever, operatin g the machine under s evere condit ions at th e beginn ing can adversely affec t the performance and s horten t he Be sur e to break-in the machine for the initial 1 00 hours (as indicated b y the servic During break-in operatio ns, follow the precauti ons described in this manual Idle the engine for 5 minutes after starti ng it up. high speeds.
Av oid operation wi th heavy loads or at Im mediatel y after s tarting the engine, av oid sudden starts, sudden acceleration, unnece ssary sudden stops, and sud den changes in direction. Avoid abrupt acceleration until warm-up run is completed. Do not If it is run the necessar engine a y to run t t low idle or high idle fo he engine at idle, apply r more than 20 minutes. a load or run at a mediu 1. T urn fuel control dial (1) to the center position between LO ID m LE (MI N) and HIGH IDLE (MAX) and run the engine h no load. edium s peed fo r about 5 minutes wit