. OPERATION OPERATION 2. After the assembly, grease shim adjusting positions (1) to (3) and check that each part turns smoothly. ADJUSTING TENSION OF CENTER BRACE (Power tiltdozer only) (Powertilt, Power pitch dozer only) In case the work equipment assembly is disassembled for transportation and reassembled at a worksite, tension of the center brace has to be adjusted anew. Otherwise the bushing at the connecting part of blade and straight frame will likely slip off, allowing sand and dirt to enter the bushing, which eventually leads to premature wear or damage of the bushing. Make this adjustment as follows: WARNING 3 - 108 ADJUSTING SHIMS IN ASSEMBLING WORK EQUIPMEN 1.
When asse mbling the wo rk equipmen t, adjust plays in variou s part s to the optimum valu Shim adjus posi Item ting (1) tion Tilt (2) Lift (3) Center (4) Trunnion Optimum value ( 0.2 - 0.5 mm (0.008 - in) 0.020) 0.2 - 0.5 (0.008 - 0.020) 0.2 - 0.5 (0.008 - 0.020) 0.2 - 1.0 (0.008 - 0.039) Thickness of standard ( shims mm 5 in) (0.197) 4 (0.158) 5 (0.197) 10 (0.4) Except when ope rating the blade in Step 4, alw ays lock the blade contro l lever s ecurely with the work e 1. Adjust with shim (2) so th at the play of ball joint (1 ) is 0. 2 to 0. mm (0.008 to 0.020 in). (3). lade assembly. blade control lever to float the blade. in hole (4) in the center brace, and turn it in th f protrusion.
When doing this, adjust so tha between the track and frame is the same on th t sides. que: 24.5 to 49 N·m (2.5 to 5 kgf·m, 18.1 to 36. at FLOAT) ce (L) between joints is shown below. m (39.2in) m (39.1in) mm (39.2in) (3). 2. Loosen bolt 3. Install the b lade assembl 4. Operate the blade contro l lever to floa t the blade 5. Insert a bar in hole (4) in the center brace, and direction o When doin clearance D left and righ Rotating tor lbft) (Blade Standard distan ce (L) betwee n joints is sh own below D65EX : 995m D65PX : 992m D65WX : 995 6. Tighten bolt Tightening t orque: 490.3 to 608 N·m ( 50 to 62 kg f·m, 3 61.7 t 448.4 lbft) so tha same